Comprehensive Pre-Purchase & Engineering Quality Audit conducted at DHA Phase 6, Lahore. Structural frame and concrete columns show sound load-bearing continuity with proper concrete compaction.
Two attention items were documented: capillary moisture dampness on the southern retaining wall cold joint requiring PU chemical injection, and localized honeycombing on Beam B-3 junction requiring non-shrink polymer repair mortar.
Overall structural integrity is sound. Property is structurally approved subject to minor snag rectification prior to interior plaster and finishes.